Creating a basic
task: -
A blank Task Detail screen appears. For “Planned
Maintenance” the following highlighted fields
should be completed (above)
- Task Code A brief
name or code identifying the task.
- Task Description
- Standard Frequency
and Unit & Repeat.
Specifies how the next due dates are calculated
when a task is
carried out - i.e. Variable: The job will
repeat with the interval based off of the “last
done date”,
Fixed: This is a set calendar date e.g.
every 4 weeks (variable), 15th of every month
(fixed)
etc.
- PM (Planned
Maintenance) is a YES/NO
box that determines whether the task will
appear
on the “PM plan”.
Set this to Y.
- W/O Format (Work
Order Format) – The
system contains five pre-created work order
formats (job sheets)
select one from the list provided to get
the information to print out in that style.
There are several other fields and tabs within the “Task” record
which can be populated to provide information for
the person carrying out the task (full description
of the work required, readings to be taken and recorded
etc) or to be used elsewhere in the system for searching,
reporting and analysis. (See fig. 3)
|